Solutions We Offer
- Industrial Boiler Solutions
- Nebraska, NATCOM, Energy Recovery Intl.
- Full Instrumentation Solutions
- Valves, Flow, Level, Analytical
- Full Service Solutions
- Start up assistance
- Long term & short term maintenance agreements (24/7/365 factory trained techs)
- Over $1m in stock parts in Alberta
Today's SAGD Projects - Demands & Concerns
- Installed capital cost of equipment (on budget)
- Maintaining project schedule (on time)
- Plant operating costs and lifecycle costs
- Onstream availability and efficiency of system
- Larger Capacity Steam Generators offering 100% steam quality
- Fuel flexibility (ie. Potential for Bitumen burning)
- Minimizing field construction costs
SAGD Steam Generation Technology Overview Traditionally OTSG's have been used in SAGD due to:
- Less stringent water quality requirements
- No environmental regulations on water usage and waste water disposal
- Best technology of the day
However IWT'S are now gaining popularity in SAGD due to:
- Much larger capacity
- 99% steam quality
- Modularized construction
- Far less water wastage (0 - 2% blowdown)
- Ability to burn alternate fuels
- Less installed capital cost
- Less annual operating cost
- Significally better delivery
|